Loading Projects

Load a saved project to restore your entire production setup instantly.

How to load

  1. Open Settings → Project
  2. Browse your saved projects
  3. Select the project to load
  4. Tap Load
  5. Your production state is restored

What happens on load

When you load a project:

  • All source slots are configured with their saved sources
  • Scenes are recreated with their layer assignments
  • Audio levels, mute states, and routing are restored
  • Transition settings are applied
  • Streaming configuration (platform, key, bitrate) is restored
  • Overlay content and positions are set up

Network sources

Sources that depend on network connectivity (NDI, iPhone cameras) will attempt to reconnect:

  • NDI sources — pMix.studio rediscovers them on the network. If the same NDI source is available, it reconnects automatically
  • iPhone cameras — The pMix Camera app needs to be running on the iPhone. The iPad will attempt to reconnect

If a network source isn’t available when the project loads, its slot shows an error state until the source comes online.

Transitioning between projects

Loading a new project replaces the current state entirely. If you want to preserve your current setup:

  1. Save the current state as a project first
  2. Then load the new project

Tips

  • Pre-show routine — Load your project 15–30 minutes before showtime to allow network sources time to reconnect
  • Verify after loading — Check that all sources are connected, audio levels are correct, and overlays look right
  • Stream keys — Stream keys are saved with the project. If your platform uses rotating keys (e.g., Facebook), update the key after loading